One accountable team · 15 years in business Nationwide FF&E crews · Head office: Holliston, MA
FFandE Removal and Installation
FF&E removal & installation · nationwide

FF&E removal and installation, room by room, on schedule.

Casegoods, workstations, seating, fixtures and equipment taken out and set in place by crews who work to a floor plan and a calendar, not a best-effort promise.

Overview

What does an FF&E removal and installation project look like?

Most FF&E projects fail on sequencing, not muscle. Product lands before the old furniture is out, an elevator is booked by another trade, a wing that was supposed to be empty still has occupants in it. We plan the project around those realities first and move furniture second.

LRP handles both halves of the job under one contract: the removal and disposition of what is there now, and the delivery, placement and set of what is replacing it. One crew, one schedule, one point of contact, so nobody is refereeing between a mover, an installer and a hauler when a floor has to be ready Monday morning.

FFandE Removal and Installation project
Scope

What is included?

✓ Site walkthrough, room counts and access review before anything is quoted✓ Protection of floors, elevators, corridors and door frames along the work path✓ Disassembly and removal of existing casegoods, workstations, seating and fixtures✓ Receiving, inventory check and staging of incoming product✓ Delivery to room, assembly, placement and set to plan✓ Debris, packaging and carton removal at the end of each work day✓ Recycling and documented disposition of everything removed✓ Punch walk and sign-off, floor by floor
How it runs

Four steps, zero surprises

1. Walkthrough

We look at the building, the access path, the elevators and the actual room counts, not a spreadsheet estimate.

2. Scoped plan & quote

A phased schedule by floor or wing, with crew size, dates and a fixed price.

3. Execution

Crews work the sequence while the building stays open. Daily cleanup, nothing left in corridors.

4. Sign-off

Floor-by-floor punch walk, recycling documentation, and a clean handover.

Recent projects

Trusted on complex, high-visibility sites

Residence Inn by Marriott Worcester hotel exterior at dusk with lit entrance and flower beds
Residence Inn Worcester252 appliances recycled
University of Washington campus quad in Seattle with cherry blossoms in bloom
University of Washington1,293 dorm mattresses recycled and replaced
Renaissance Phoenix Downtown Hotel exterior at dusk in downtown Phoenix, Arizona
Renaissance Phoenix Downtown831 mattress sets recycled
Common questions

Questions we get about this service

Can you work in an occupied building?

Yes. Most of our work is in live hotels, campuses and offices. We phase by floor or wing, keep the work path protected and clean, and can run off-hours or overnight shifts when a space cannot be taken out of service during the day.

Do you handle both the removal and the new installation?

Yes. That is the point of the service. One contract covers taking the old product out, disposing of it responsibly, receiving the new product and installing it to plan, instead of coordinating three vendors and absorbing the gaps between them.

How much lead time do you need?

It depends on scale and season, but the earlier we walk the site the better the schedule and the price. Call 508-879-1732 with the building, the scope and the dates and we will tell you what is realistic.

Are you insured for commercial and institutional sites?

Yes. We carry commercial insurance and can provide certificates naming the owner, property manager or general contractor as required before work starts.

What happens to the furniture you remove?

Whatever can be recycled is, and the rest is disposed of properly. We can provide documentation of the disposition for your sustainability or asset-tracking records.

More from LRP

Other services

Furniture, Mattress and Equipment Turnovers

Furniture, Mattress & Equipment

Learn more →

Commercial Logistics and Project Support

Commercial Logistics & Project Support

Learn more →

Cleanouts and Facility Turnovers

Commercial Cleanouts

Learn more →

Commercial Painting, interior and exterior

Commercial Painting

Learn more →

Get a quote

Tell us about your project

Give us the building, the scope and the dates. Someone from our team will contact you within one business day.

Prefer to talk it through? Call 508-879-1732 or email info@lrpcontractors.com.